🚧Construction
-
2026
01.30
(Third Notice) Power Outage Notice for Scheduled Electrical Equipment Maintenance and Inspection During the 2026 Winter Break (Please be informed).1. Power Outage Schedule: The power will be suspended from 8:00 a.m. to 7:00 p.m. each day. Power supply will be restored earlier if maintenance is completed ahead of schedule. (1) January 31, 2026 (Saturday): I. Yun De Building, Yi De Building, Chong De Building, Ju De Building, Ming De Building, Female Faculty Dormitory, Male Faculty Dormitory, and the Activity Center – both general and emergency power supply will be suspended. II. First Medical Building, Second Medical Building, Cultural Heritage Hall, Engineering Building, Library, and Administration Building – general power will be suspended; limited emergency power will remain available based on generator capacity. (2) February 6, 2026 (Friday): First Medical Building – Emergency power outage (including elevators). During this period, elevators in the First Medical Building will be out of service. Please use the elevators in the Engineering Building instead. 2. Important Notes: (1) To ensure the proper operation of the emergency power system, please do not connect regular power equipment to emergency outlets during the outage. Overloading the emergency power supply may cause generator shutdowns and affect system stability. (2) Please keep the doors of refrigerators and freezers closed during the outage to maintain cooling if not urgently needed. (3) Shut down computers and laboratory instruments in advance, avoid using elevators, and ensure critical equipment is connected to an uninterruptible power supply (UPS) or small generator. (4) During the outage, turn off or unplug electrical devices. After power restoration, please assign personnel to check equipment before use. 3. Contact Information (Property Management Division): (1) Mr. Ting – ext. 5165 / Mobile: 0984-262-343 (2) Mr. Su – ext. 5599 / Mobile: 0984-262-033 Contact person:Tommy Contact number:409-5165
-
2026
01.20
Scheduled Generator Maintenance in January 2026 (Please be informed).1. Maintenance Schedule: Friday, January 23, 2026 – 8:30 AM to 5:00 PM. 2. Important Notes: The Office of General Affairs will conduct testing during class breaks, which may generate noise and exhaust. Please do not be alarmed. We apologize for any inconvenience and appreciate your understanding. 3. Contact Information: (1) Construction & Maintenance Section: •Mr. Ting, Ext. 5165, Mobile: 0984-262-343. •Mr. Su, Ext. 5599, Mobile: 0984-262-033. (2) Security Office: Ext. 5000. Contact person:Tommy Contact number:409-5165
-
2026
01.13
(Second Notice) Power Outage Notice for Scheduled Electrical Equipment Maintenance and Inspection During the 2026 Winter Break (Please be informed).1. Power Outage Schedule: The power will be suspended from 8:00 a.m. to 7:00 p.m. each day. Power supply will be restored earlier if maintenance is completed ahead of schedule. (1) January 17, 2026 (Saturday): Second Medical Building – Emergency power outage (including elevators). (2) January 18, 2026 (Sunday): Administration Building – Emergency power outage (including elevators). (3) January 31, 2026 (Saturday): I. Yun De Building, Yi De Building, Chong De Building, Ju De Building, Ming De Building, Female Faculty Dormitory, Male Faculty Dormitory, and the Activity Center – both general and emergency power supply will be suspended. II. First Medical Building, Second Medical Building, Cultural Heritage Hall, Engineering Building, Library, and Administration Building – general power will be suspended; limited emergency power will remain available based on generator capacity. (4) February 6, 2026 (Friday): First Medical Building – Emergency power outage (including elevators). During this period, elevators in the First Medical Building will be out of service. Please use the elevators in the Engineering Building instead. 2. Important Notes: (1) To ensure the proper operation of the emergency power system, please do not connect regular power equipment to emergency outlets during the outage. Overloading the emergency power supply may cause generator shutdowns and affect system stability. (2) Please keep the doors of refrigerators and freezers closed during the outage to maintain cooling if not urgently needed. (3) Shut down computers and laboratory instruments in advance, avoid using elevators, and ensure critical equipment is connected to an uninterruptible power supply (UPS) or small generator. (4) During the outage, turn off or unplug electrical devices. After power restoration, please assign personnel to check equipment before use. 3. Contact Information (Property Management Division): (1) Mr. Ting – ext. 5165 / Mobile: 0984-262-343. (2) Mr. Su – ext. 5599 / Mobile: 0984-262-033. Contact person:Tommy Contact number:409-5165
-
2026
01.12
Temporary Suspension of Central Air Conditioning Supply in Campus Buildings for Annual Maintenance (Please be informed).1. Schedule of Suspension in Each Building (1) Second Medical Building and Management Building: From 7:00 a.m. to 10:00 p.m. on February 1, 2026 (Sunday). (2) First Medical Building, Engineering Building, and the Library: From 7:00 a.m. to 10:00 p.m. on February 8, 2026 (Sunday). 2. During the maintenance period, the supply of water, electricity, and independently operated air-conditioning units in each office will not be affected. If the maintenance is completed ahead of schedule, the central air conditioning supply will resume earlier. Contact person:Chen,Ying-Chuan Contact number:409-5166
-
2025
12.26
Schedule of Operating Hours of Restaurants and Shops during the of the First Semester of the 2025-2026 Academic Year and the Winter Break (Please be informed).1. The schedule of operating hours for campus restaurants and shops during the Flexible Learning Week of the first semester of the 2025-2026 Academic Year and the winter break is provided in the attachment. Adjustments will be made on a rolling basis in response to actual needs. Any changes will be announced separately. We apologize for any inconvenience caused. 2. Contact Information: Mr. Wang, Office of General Affairs, Extension 5234; Email: D000004750@cgu.edu.tw Contact person:yaotse Contact number:409-5234
-
2025
11.25
Scheduled Generator Maintenance in November 2025 (Please be informed).1. Maintenance Schedule: Thursday, November 27, 2025 – 8:30 AM to 5:00 PM. 2. Important Notes: The Office of General Affairs will conduct testing during class breaks, which may generate noise and exhaust. Please do not be alarmed. We apologize for any inconvenience and appreciate your understanding. 3. Contact Information: (1) Construction & Maintenance Section: •Mr. Ting, Ext. 5165, Mobile: 0984-262-343. •Mr. Su, Ext. 5599, Mobile: 0984-262-033. (2) Security Office: Ext. 5000. Contact person:Tommy Contact number:409-5165