On Thursday, April 3, 2025, there will be a temporary suspension of services in the following areas: General lighting, power outlets, and air conditioning in the First Medical Building, and air conditioning in the Engineering Building. Please be informed.

1.Reason:
Replacement of high and low voltage equipment in the power center of the First Medical Building requires a temporary suspension of general lighting, power outlets, and air conditioning to ensure electrical safety during construction.
2.Power Outage Schedule:
Thursday, April 3, 2025, from 8:00 AM to 7:00 PM.
3.Affected Areas:
(1)First Medical Building: General lighting, power outlets, and air conditioning.
(2)Engineering Building: Air conditioning only.
Precautions:
(1)Emergency power supply and elevators will not be affected by this outage.
(2)Do not open refrigerators or freezers unless absolutely necessary to maintain their cooling efficiency.
(3)Shut down computers and instruments in advance. Ensure critical equipment is equipped with an uninterruptible power supply (UPS) or a portable generator.
(4)Turn off or unplug any electrical appliances in use during the outage. After power is restored, conduct equipment checks before resuming use.
(5)Power will be restored earlier if the construction is completed ahead of schedule.
(6)For inquiries, please contact the Facilities Management Division (Extension 3000).

Contact person:Tommy
Contact number:409-5165